First, electrical installation works
Electrical power:
Complete sets of power distribution cabinets, control cabinets (screens, tables) and power, lighting distribution boxes (discs) and control cabinet installation, low-voltage electric motors, electric heaters and electric actuatorinspection, wiring, low-voltage electrical power equipment detection, testing and air-load test run, bridge installation and bridge cable laying, wire, cable conduits and cable slot laying, wire, wire, Cable tube and cable groove laying, cable head production, wire connection line electrical test, socket, switch, fan installation.
Electrical lighting installation:
Complete sets of power distribution cabinets, control cabinets (screens, tables) and power, lighting distribution boxes (discs) and control cabinet installation, wire, cable conduits and cable grooves, wire, cable conduit and cable groove slot laying, slot plate wiring, steel cable wiring, cable head production, wire connection and line electrical test, ordinary lighting installation, special lighting installation, socket, switch, switch Fan installation, building lighting power-up trial run.
Backup and uninterruptible power installation:
Complete sets of power distribution cabinets, control cabinets (screens, tables) and power, lighting power distribution box (disc) installation, uninterruptible power supply of other functional units installation, bare bus, closed bus, plug-in bus installation, wire, cable and cable and cable groove slot laying, wire and cable conduit and cable groove laying, cable head production, wire connection and line electrical test, grounding device installation.
Mine and ground mounting:
Grounding device installation, lightning-safe lead and switching room ground trunk laying, building and other potential connections, flasher installation.
Second, ventilation and ventilation works
Ventilation is an important measure to control the indoor environment. At present, the measures taken by ventilation and ventilation are mainly: point smoke, local exhaust, ventilation and ventilation throughout the room and other ways.
1, local exhaust
Local exhaust is to exclude welding flue gas from the vicinity of the welding arc area, in form: high-pressure system of high wind volume, high-pressure system of small wind volume, mobile welding soot purification machine, etc. The exhaust volume and wind speed of the smoke-filled unit must be suitable, the air volume is too small to smoke out, the air volume is too large to make the protection atmosphere destroyed, and affect the welding quality. When using point smoke, the amount of protective gas should be increased accordingly.
2, full room ventilation
The purpose of the whole room ventilation is mainly: the introduction of fresh air outdoor, in order to dilute the concentration of smoke in the indoor air, so that the average concentration of flue gas in the work area is controlled below the allowable standard. From the point of view of air balance, the need to introduce how much fresh air must be discharged the same amount of indoor air, so that fresh air is constantly introduced, indoor polluted air continues to drain, thus taking away the continuous production of welding soot indoors.
Third, the process pipeline installation project
Process pipe is designed to meet the requirements of industrial production of a variety of piping systems, including process ring freezing, cooling water system, compressed air piping system, steam pipeline system, purification pipe system, and a variety of material piping systems.